
Energy
Solar power for the plant
We work with Emerge, the Masdar–EDF joint venture, on solar power for our operations in KEZAD.
Hot induction bending · Abu Dhabi
The GCC’s only hot induction bending plant covering the full 4″–80″ range, with every service around the bend on one purchase order.

Who we are
A UAE manufacturer of hot induction bends, built so that no project in the region has to wait for an imported bend.
From our plant in KEZAD Al Taweelah, beside Khalifa Port, two production lines bend carbon steel pipe from 4″ to 80″ for oil and gas, water, power and infrastructure, with every bend documented and traceable.

Two lines, the full 4″–80″ range, and fabrication, coating and logistics around every bend.
See capabilities
ADNOC approved and TÜV SÜD certified, with an on-site NDT and mechanical test laboratory.
See quality
A hot induction bending plant in KEZAD beside Khalifa Port, a certified ICV score of 46.52% and a home in Make it in the Emirates.
See companyHow a bend is made
The coil heats a narrow band, the arm swings the pipe through its radius, and water quenches the steel as it leaves.
The coil brings a narrow band to about 1,000 °C.
The pipe is pushed through the coil as the arm forms the radius.
Water locks in the properties as steel leaves the hot zone.
Angle reached, the bend moves on to heat treatment and testing.
Illustration: 36″ pipe at a 5D radius (4,572 mm). Not to scale.
Industries
Our home market is the UAE, with deliveries across the GCC and, with EPC partners, to Africa, Europe and South America.
Serving the region’s energy companies





News and recognition
Milestones from the plant, and the people and institutions that have recognised the work.

The KEZAD plant opened its doors with government and industry partners.
Read moreDirector Vinay Kalantri featured for Make it in the Emirates 2025.
Read moreFeatured by the Abu Dhabi Investment Office.
Read moreCertificate No. 151534 under the national ICV programme.
Read moreDrawings, sizes and grades are enough to start.
Home / Capabilities
Two hot induction bending lines covering 4″ to 80″, with fabrication, coating, logistics and a full data record around every bend.
Range
Line 1 covers 4″–36″ and Line 2 covers 24″–80″. The overlap means mid-range work never waits on one machine.
Standard nominal sizes, with outside diameter and centreline radius for your bend factor.
Runs on Line 1 or Line 2
Each induction bend replaces an elbow and two girth welds. Enter the bends on your route.
240
girth welds removed from the line
Based on two girth welds saved per bend versus welded elbows.

Process
Mill certificate review, PMI and dimensional check.
Radius, angle and speed programmed; coil and clamp fitted.
A narrow band of the pipe is heated to about 1,000 °C.
Pushed through the coil as the arm forms the bend.
Stress relief or quench and temper restores properties.
UT, MPI, hardness, ovality and wall-thinning checks.
Bevelled, hydrotested, blasted and coated as required.
Data record, dossier and MTC issued; marked and dispatched.
Products and services
An EPC buying bends, pipe, fittings and coating from four parties manages four interfaces. We turn them into one UAE purchase order.
4″–80″, walls to 60 mm, API 5L grades to X80, radii 2D–10D and angles to 90°.
Spools, segmentable and structural bends on the same yard.
PU, epoxy, FBE and 3LPE through our coating partners.
Line pipe, fittings and flanges from partner mills, or free-issued by you.
Forwarding, a bonded yard next to Khalifa Port and site kitting in installation order.
48-hour quotations, expedite slots under three weeks and bank-funded 90–120 day terms.
EAF-sourced pipe and solar power, for projects with carbon targets.
Process and test data for every bend, traceable from heat number to delivery note.
Logistics
Khalifa Port, our bonded yard and the plant sit side by side in KEZAD, so pipe moves from the quay to the bending line without leaving the zone. One reference follows every bend to site.
Line pipe is ordered from our partner mills, or free-issued by you, and inspected before it ships.
Pipe travels as consolidated project cargo on our logistics partners’ fleets.
Customs clearance is handled in house at Khalifa Port, next door to the plant.
Pipe is stored and preserved in our bonded yard beside the port, ready for the bending line.
Every bend is made, tested and coated in KEZAD, and logged under its own number.
Heavy-lift dispatch by road to KSA and Oman, or by sea with re-export papers for Iraq, Africa and beyond.
Bends arrive kitted in installation order, each with its full data record.
Data record
Each bend generates its data twice: once to make it, once to prove it. We keep both and hand them to you with the bend.
BEND RECORD · PT-L2-04817
36″ · 5D · 45° pipeline bend
Example record with illustrative values.
Home / Quality
Built to the codes your projects specify, verified by independent bodies and tested on site before every release.
Codes
| Code | Scope | Status |
|---|---|---|
| ASME B16.49 | Wrought steel induction bends | Built to |
| ISO 15590-1:2024 | Induction bends for pipelines | TÜV SÜD assessed |
| ASME B31.3 · B31.4 · B31.8 | Process piping and pipelines | Tested to |
| ADNOC AVL | Product Group 160750 | Approved |
Product Group 160750, hot induction bends CS. Supplier ID 10078396.
ISO 9001, 14001 and 45001 certified, with an ISO 15590-1:2024 Letter of Performance.
Score 46.52%, certificate No. 151534, valid to May 2027.


On-site laboratory
Our NDT and mechanical test laboratory sits inside the plant, so testing never leaves the chain of custody.
Home / Sustainability
About 85% of a bend’s footprint is its steel, so we cut carbon where it counts: in the pipe we buy, the power we use and the water we recover.

Energy
We work with Emerge, the Masdar–EDF joint venture, on solar power for our operations in KEZAD.
Water
With Ma Hawa, steam from the bending process is recovered and turned into drinking water.
An ESG and net-zero programme with SGS under the Abu Dhabi Chamber.
Heat recovery, water reuse and offcuts sorted by grade, with EAF-sourced pipe for low-carbon bends.
Home / Company
Established to transform the sector, delivering innovative, high-quality bends tailored to each client, from a 90° turn to a complex U-bend.
Profile
A UAE manufacturer of carbon steel hot induction bends, building local capability under Make it in the Emirates.
Vision and mission
Our vision
To be the global leader in precision bending solutions, driving innovation and excellence in every project, and setting the standard for quality and sustainability in the industry.
Our mission
To deliver superior hot induction bending services that exceed our clients’ expectations, through continuous improvement, leading technology and a culture of safety, integrity and environmental responsibility.
Core values
Precision and reliability in every bend we deliver.
We understand our clients’ needs and aim to exceed them.
We protect our people, our clients and the environment.
We continually improve our processes and technology.
We conduct our business with honesty and transparency.
We foster a collaborative and inclusive culture.
Recognition
The plant was inaugurated with government and industry partners in KEZAD.
Director Vinay Kalantri, Make it in the Emirates 2025
Featured by ADIO

Location
Between Abu Dhabi and Dubai, with the port, our bonded yard and the plant side by side in KEZAD Al Taweelah.
Reach from KEZAD
Partners
Every bend we make passes through a chain of partners. These are the names on it today.
Line pipe



Made here

Bend, heat treat, test, coat and document in KEZAD.
Verified




Built by








In service with






Backed by government and industry













In-Country Value
Certificate No. 151534 · valid to May 2027
Purchases from ICV-certified suppliers count towards our clients’ own ICV scores.
Bends made in Abu Dhabi cut reliance on imports and keep value in the UAE.
In line with Tawteen, we share manufacturing know-how with young Emiratis.
A proud supporter of the national drive to grow UAE manufacturing.
Home / Contact
Send your bend list or drawings for a quotation within 48 hours, or visit the plant in KEZAD and see the lines for yourself.
Contact details

Pipetec Solutions Manufacturing LLC proudly participated in Make it in the Emirates 2025, held at the ADNEC Centre Abu Dhabi from 19 to 22 May 2025. The event brought together leading industrial players, policymakers, and innovators to highlight the UAE’s rapidly growing advanced manufacturing ecosystem.
For Pipetec, this was far more than an exhibition, it was a defining chapter marked by a landmark product debut, six strategic partnerships, and high-level government recognition.
A First-of-its-Kind UAE Manufactured Product
At the event, Pipetec unveiled a major milestone for the region’s industrial sector the first-ever made-in-UAE 48-inch OD hot induction bend.
This product represents a significant advancement in large-diameter pipe bending technology within the UAE, reinforcing Pipetec’s position as a regional leader in hot induction bending manufacturing.
Six Strategic MoUs Signed at the Event
Pipetec signed six Memorandums of Understanding during the exhibition, strengthening collaborations across sustainability, manufacturing, and investment:
Recognition & Institutional Support
Pipetec’s participation received strong institutional visibility from the UAE’s most influential bodies:
Strong Brand Presence at the Event
Pipetec maintained a prominent branding and media presence throughout the four-day event:
Distinguished Visitors
A key highlight was the visit of His Excellency Sheikh Nahyan bin Mubarak Al Nahyan, UAE Minister of Tolerance and Coexistence, to the Pipetec booth. His Excellency spent time understanding the company’s advanced manufacturing capabilities and sustainability initiatives, a recognition that reflects the national significance of Pipetec’s work.
Looking Ahead
Pipetec’s participation at Make it in the Emirates 2025 marked a defining moment in its journey as a UAE-born advanced manufacturing company. From showcasing a landmark engineered product to signing impactful sustainability-driven MoUs and receiving high-level government recognition, the event reinforced Pipetec’s commitment to supporting the UAE’s industrial growth, localisation, and innovation agenda.
Pipetec continues to move forward with a clear vision, building world-class manufacturing capabilities in the UAE with a strong focus on sustainability, localisation, and global competitiveness.


Abu Dhabi, UAE – 21 January 2026 – Pipetec Solutions Manufacturing LLC, the MEA region’s largest advanced hot induction pipe bend manufacturing facility, proudly marks a major…
Read article
The seven things a bend enquiry needs, from pipe grade and radius to tolerances, testing and how the bends should arrive on site.
Read article
Every change of direction made with a welded elbow adds two girth welds to the line. An induction bend removes them, and much of the inspection and schedule risk with them.
Read articleDrawings, sizes and grades are enough to start.